When combined with the Timesheet functionality, rate cards enable costs to be associated with time delivered. Rate cards can be set-up in one of two ways:
- At a global level for all users based on a specific project role
- At a project level based on a specific user. Users can have different rates across different projects.
Global Rate Cards
To set-up rate cards at a global level, click on the Administration Cog > Rate Cards. From here either set a single rate for all timesheet users using the Default role, or alternatively assign different rates for each project role. Any role without a rate assigned to it will use the default rate.
To add a new global rate, select a role from the list and then click on the 'Add Period' button on the right-hand side (button will only display when adding a rate to a role for the first time).
![](https://static.helpjuice.com/helpjuice_production/uploads/upload/image/14008/direct/1674122801954-Project%2BRole%2B-%2BRate%2BCards.png)
A pop-up will appear. Complete the rate card information for that period and when ready, click OK. Once a rate has been added for a role, the dates for that period can't be changed but the rate itself can be. Note: The rate is the cost per hour.
![](https://static.helpjuice.com/helpjuice_production/uploads/upload/image/14008/direct/1714743431814-Project%2BRole%2BRate%2BCards%2BDeafult.png)
To add another date period and associated rate for a role, click on the downward arrow against an existing rate to reveal a sub-menu.
- Insert Before – to add a new rate that abuts the first date of the existing rate.
- Insert After – to add a new rate that abuts the end date of the existing rate.
- Insert – to insert a new date range within the existing rate.
Project Specific Rate Cards
To add a rate card against a specific user within a project, navigate to the project and then against the Team Members control, select the downward arrow next to Add and select Rate Cards.
![](https://static.helpjuice.com/helpjuice_production/uploads/upload/image/14008/direct/1714743687708-Project%2BSpecific%2BRate%2BCards.png)
Select the user from the list of team members and click on the 'Add Period' button on the right-hand side (button will only display when adding a rate to the user for the first time).
A pop-up will appear. Complete the rate card information and when ready, click OK. Once a rate has been added, the dates for that period can't be changed but the rate itself can be. Note: The rate is the cost per hour.
To add another date period and associated rate for that user, click on the downward arrow against an existing rate to reveal a sub-menu.
- Insert Before – to add a new rate that abuts the first date of the existing rate.
- Insert After – to add a new rate that abuts the end date of the existing rate.
- Insert – to insert a new date range within the existing rate.
Top Tips
- You can use both global and project rate cards at the same time. The system will seek the rate in the following order:
- Rate against the user in the specific project
- Rate against the project role
- Rate against the default role
- If you are using rate cards, the rates must be kept up-to-date. If there is no rate entered, submitted timesheets for that period can't be approved.
- Rate cards can be switched off if not required.
- Approved and unapproved costs can be viewed at the individual project level via Actions > Timesheet Records. If this option isn't visible, it will need to be added onto the stage configuration in the same way governance reports are.